<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
<channel>
  <title>TemGlass</title>
  <link>https://www.temglass.com/</link>
  <description>Tempered Glass Specs, Certifications &amp; Industry Insight</description>
  <language>en</language>
  <lastBuildDate>Fri, 13 Nov 2026 05:46:37 GMT</lastBuildDate>
  <atom:link href="https://www.temglass.com/feed.xml" rel="self" type="application/rss+xml"/>
  <item>
    <title>Drift, Clearance, and the Fallout Question: Reviewing Tempered Glazing in U.S. Seismic Zones</title>
    <link>https://www.temglass.com/seismic-glazing-checklist-tempered-panels-us-seismic-zones/</link>
    <guid isPermaLink="true">https://www.temglass.com/seismic-glazing-checklist-tempered-panels-us-seismic-zones/</guid>
    <description>In seismic regions, glazing is judged less on strength than on how gracefully it moves with a frame that is moving too. This review covers design drift, edge clearance, laminated-versus-tempered decisions, and the test reports that should be in hand before shop drawings are finalized.</description>
    <author>TemGlass</author>
    <category>Engineering &amp; Design</category>
    <pubDate>Fri, 13 Nov 2026 02:24:54 GMT</pubDate>
  </item>
  <item>
    <title>Frit, Furnace, and Final Color: Specifying Printed Glass That Survives Tempering</title>
    <link>https://www.temglass.com/ceramic-frit-digital-printing-before-tempering-specification/</link>
    <guid isPermaLink="true">https://www.temglass.com/ceramic-frit-digital-printing-before-tempering-specification/</guid>
    <description>Ceramic frit, bird-friendly patterns, and branded graphics are typically applied before the glass is tempered, which means the approval clock and the revision window close earlier than most buyers expect. Here is how printing interacts with the furnace, the color, the surface, and the warranty.</description>
    <author>TemGlass</author>
    <category>Technical Specifications</category>
    <pubDate>Fri, 13 Nov 2026 02:24:54 GMT</pubDate>
  </item>
  <item>
    <title>The Fire Rating Lives in the Assembly: Why Tempered Glass Cannot Carry a Fire Separation Alone</title>
    <link>https://www.temglass.com/fire-rating-lives-in-the-assembly-tempered-glass-fire-separation/</link>
    <guid isPermaLink="true">https://www.temglass.com/fire-rating-lives-in-the-assembly-tempered-glass-fire-separation/</guid>
    <description>Tempered glass answers a human-impact question; fire-rated glazing answers a containment question, and the two are certified under entirely separate standards. This review separates the code paths, the label types, and the substitution traps that most often turn a clean submittal into a rejected one.</description>
    <author>TemGlass</author>
    <category>Certifications &amp; Compliance</category>
    <pubDate>Fri, 13 Nov 2026 02:24:54 GMT</pubDate>
  </item>
  <item>
    <title>Between the Shaft and the Code: Why Elevator Glazing Answers to a Regulator Most Glass Buyers Never Meet</title>
    <link>https://www.temglass.com/elevator-hoistway-glazing-rulebook/</link>
    <guid isPermaLink="true">https://www.temglass.com/elevator-hoistway-glazing-rulebook/</guid>
    <description>Elevator and escalator glazing isn&#039;t governed by the building code alone — it sits under ASME A17.1, a safety standard that most glazing contractors rarely encounter. Here&#039;s what procurement teams need to know before a substitution request stalls a hoistway package.</description>
    <author>TemGlass</author>
    <category>Certifications &amp; Compliance</category>
    <pubDate>Fri, 06 Nov 2026 08:02:20 GMT</pubDate>
  </item>
  <item>
    <title>Guard Loads and Glass Views: What Multifamily Developers Owe Their Balcony Railing Specs</title>
    <link>https://www.temglass.com/guard-loads-and-glass-views-multifamily-railing-specs/</link>
    <guid isPermaLink="true">https://www.temglass.com/guard-loads-and-glass-views-multifamily-railing-specs/</guid>
    <description>Frameless tempered glass railings are becoming the default choice on balconies, stairs, and mezzanines in American multifamily construction. We examine the IBC load requirements behind the trend, the rent premiums developers are banking on, and the maintenance terms property managers should negotiate before signing a supplier contract.</description>
    <author>TemGlass</author>
    <category>Market Analysis</category>
    <pubDate>Fri, 06 Nov 2026 04:02:48 GMT</pubDate>
  </item>
  <item>
    <title>Garage Doors, Garden Tubs, and the Code Nobody Reads: Safety Glazing Gaps in America&#039;s ADU Boom</title>
    <link>https://www.temglass.com/adu-safety-glazing-gaps-tempered-garage-conversions/</link>
    <guid isPermaLink="true">https://www.temglass.com/adu-safety-glazing-gaps-tempered-garage-conversions/</guid>
    <description>Accessory dwelling units are multiplying across US cities, yet many are built by small contractors and owner-builders who have never opened a glazing code chapter. This piece maps where tempered glass is actually required in a typical ADU conversion — and how suppliers can catch dangerous overspecs and underspecs before the order ships.</description>
    <author>TemGlass</author>
    <category>Certifications &amp; Compliance</category>
    <pubDate>Fri, 06 Nov 2026 00:05:09 GMT</pubDate>
  </item>
  <item>
    <title>The Wall That Isn&#039;t: A Spec Checklist for Tempered Glass Partitions in the Hybrid Office</title>
    <link>https://www.temglass.com/spec-checklist-tempered-glass-partitions-hybrid-office/</link>
    <guid isPermaLink="true">https://www.temglass.com/spec-checklist-tempered-glass-partitions-hybrid-office/</guid>
    <description>Glass partitions have quietly become the default wall system of the American hybrid office, yet most facility managers inherit specs they never wrote. This buyer&#039;s guide covers thickness selection, head-track tolerance, the gap between promised and actual acoustic performance, and the compliance traps that surface when annealed glass is substituted to save a few dollars per panel.</description>
    <author>TemGlass</author>
    <category>Certifications &amp; Compliance</category>
    <pubDate>Thu, 05 Nov 2026 20:04:13 GMT</pubDate>
  </item>
  <item>
    <title>The Last Twenty Feet: Why Tempered Panels That Survive the Furnace Die on the Dock</title>
    <link>https://www.temglass.com/last-twenty-feet-tempered-panels-die-on-the-dock/</link>
    <guid isPermaLink="true">https://www.temglass.com/last-twenty-feet-tempered-panels-die-on-the-dock/</guid>
    <description>ASTM C1048 and CPSC 16 CFR 1201 can certify a panel&#039;s strength, but no lab test covers the fork tilt, the dolly bump, or the cracked sidewalk between the truck and the lobby. We spoke with freight handlers and safety managers about where tempered glass actually fails, and built a receiving checklist that turns the last twenty feet into a documented process.</description>
    <author>TemGlass</author>
    <category>Certifications &amp; Compliance</category>
    <pubDate>Thu, 05 Nov 2026 12:03:13 GMT</pubDate>
  </item>
  <item>
    <title>Before the Furnace or After: Why Coating Sequences Decide What Your Tempered Glass Order Can Actually Do</title>
    <link>https://www.temglass.com/coating-sequences-tempered-glass-furnace/</link>
    <guid isPermaLink="true">https://www.temglass.com/coating-sequences-tempered-glass-furnace/</guid>
    <description>Every finish on a tempered panel — frosted, tinted, or low-E coated — carries a decision about when it gets applied, and that timing ripples straight into your quote and delivery schedule. This breakdown maps the sequencing rules specifiers need to know before drawings go out for bid.</description>
    <author>TemGlass</author>
    <category>Market Analysis</category>
    <pubDate>Thu, 05 Nov 2026 04:01:37 GMT</pubDate>
  </item>
  <item>
    <title>Shattered, Shipped, Buried: Following a Failed Tempered Panel to the End of Its Life</title>
    <link>https://www.temglass.com/where-broken-tempered-glass-actually-goes/</link>
    <guid isPermaLink="true">https://www.temglass.com/where-broken-tempered-glass-actually-goes/</guid>
    <description>Once tempered glass fails, it cannot be cut, reused, or easily recycled — and most of it ends up in a landfill. As sustainability scoring enters more US construction bids, the end-of-life story of a shatterproof panel is quietly becoming a procurement question. Here&#039;s what buyers and specifiers need to know.</description>
    <author>TemGlass</author>
    <category>Market Analysis</category>
    <pubDate>Wed, 04 Nov 2026 20:01:24 GMT</pubDate>
  </item>
  <item>
    <title>Inside the Numbers: What a Tempered Glass Quote Is Really Telling You</title>
    <link>https://www.temglass.com/what-a-tempered-glass-quote-is-really-telling-you/</link>
    <guid isPermaLink="true">https://www.temglass.com/what-a-tempered-glass-quote-is-really-telling-you/</guid>
    <description>Two fabricators can quote the &#039;same&#039; tempered panel and land 40 percent apart — and both can be right. This breakdown traces the real cost drivers behind a quote, from sheet yield to oven batch density, and argues that buyers who understand them negotiate better and schedule smarter.</description>
    <author>TemGlass</author>
    <category>Market Analysis</category>
    <pubDate>Wed, 04 Nov 2026 16:01:36 GMT</pubDate>
  </item>
  <item>
    <title>No Second Chances After the Furnace: Why Every Hole and Notch Must Exist Before Tempering</title>
    <link>https://www.temglass.com/fabrication-before-tempering-holes-notches/</link>
    <guid isPermaLink="true">https://www.temglass.com/fabrication-before-tempering-holes-notches/</guid>
    <description>Tempered glass cannot be drilled, notched, or cut after heat treatment — attempting it means certain breakage. This article explains why, walks through a real-world change-order scenario, and provides a pre-order audit checklist for construction buyers.</description>
    <author>TemGlass</author>
    <category>Certifications &amp; Compliance</category>
    <pubDate>Wed, 04 Nov 2026 12:01:30 GMT</pubDate>
  </item>
  <item>
    <title>The Five Details That Turn a Clean Quote Into a Costly Change Order</title>
    <link>https://www.temglass.com/five-details-glass-quote-change-orders/</link>
    <guid isPermaLink="true">https://www.temglass.com/five-details-glass-quote-change-orders/</guid>
    <description>Most tempered glass RFQs are priced on incomplete information, and the gap shows up later as change orders, rescheduled deliveries, and strained vendor relationships. This piece walks through the five specification details that most often trigger re-pricing, and offers a pre-quote checklist procurement teams can circulate before pricing begins.</description>
    <author>TemGlass</author>
    <category>Market Analysis</category>
    <pubDate>Wed, 04 Nov 2026 08:02:22 GMT</pubDate>
  </item>
  <item>
    <title>Nominal on Paper, Off by a Millimeter: The Hidden Variability Behind &#039;Standard&#039; Tempered Panel Sizes</title>
    <link>https://www.temglass.com/nominal-vs-actual-tempered-glass-thickness-tolerances/</link>
    <guid isPermaLink="true">https://www.temglass.com/nominal-vs-actual-tempered-glass-thickness-tolerances/</guid>
    <description>Two fabricators can both ship a &#039;3/8-inch&#039; tempered panel and still be within spec — and that&#039;s exactly the problem. We break down nominal thickness conventions, how fabrication tolerances stack across holes and notches, and the pre-order checklist that keeps replacement panels fitting the first time.</description>
    <author>TemGlass</author>
    <category>Certifications &amp; Compliance</category>
    <pubDate>Wed, 04 Nov 2026 04:02:22 GMT</pubDate>
  </item>
  <item>
    <title>Chemistry Meets the Panel: Building a Cleaning Spec That Keeps Tempered Glass Under Warranty</title>
    <link>https://www.temglass.com/cleaning-spec-tempered-glass-warranty/</link>
    <guid isPermaLink="true">https://www.temglass.com/cleaning-spec-tempered-glass-warranty/</guid>
    <description>Aggressive janitorial chemistry and high-pressure washing can quietly etch tempered surfaces, undermining the very strength the tempering process was meant to deliver. This article outlines the maintenance language facility managers and contractors should embed in every storefront and glass door contract before handoff.</description>
    <author>TemGlass</author>
    <category>Certifications &amp; Compliance</category>
    <pubDate>Wed, 04 Nov 2026 00:02:52 GMT</pubDate>
  </item>
  <item>
    <title>Crate Opened, Panel Cracked: The First 72 Hours After a Broken Tempered Glass Delivery</title>
    <link>https://www.temglass.com/first-72-hours-after-broken-tempered-glass-delivery/</link>
    <guid isPermaLink="true">https://www.temglass.com/first-72-hours-after-broken-tempered-glass-delivery/</guid>
    <description>Most transit damage claims on tempered glass orders fail not because the glass wasn&#039;t damaged in transit, but because the buyer mishandled the first three days. This playbook walks contractors through documentation, carrier liability, and replacement planning before the driver pulls away.</description>
    <author>TemGlass</author>
    <category>Market Analysis</category>
    <pubDate>Tue, 03 Nov 2026 20:03:01 GMT</pubDate>
  </item>
  <item>
    <title>Reading the Corner Logo: What a Tempered Glass Stamp Actually Guarantees on Delivery Day</title>
    <link>https://www.temglass.com/what-tempered-glass-stamp-actually-guarantees/</link>
    <guid isPermaLink="true">https://www.temglass.com/what-tempered-glass-stamp-actually-guarantees/</guid>
    <description>The etched logo in the corner of every tempered lite is often treated as proof of compliance, yet most buyers cannot say precisely what it certifies. This guide explains how to decode a temper stamp, why subcontracted fabrication complicates accountability, and how to write submittal language that protects your project.</description>
    <author>TemGlass</author>
    <category>Certifications &amp; Compliance</category>
    <pubDate>Mon, 02 Nov 2026 20:03:51 GMT</pubDate>
  </item>
  <item>
    <title>From Windshield to Storefront: What Architectural Buyers Can Learn — and Unlearn — From Automotive Glass Standards</title>
    <link>https://www.temglass.com/automotive-vs-architectural-tempered-glass-standards/</link>
    <guid isPermaLink="true">https://www.temglass.com/automotive-vs-architectural-tempered-glass-standards/</guid>
    <description>Panoramic glass roofs have turned every new EV into a rolling showroom for large-format tempered panels, and commercial clients are starting to ask why their storefront glass can&#039;t match that clarity and finish. But automotive and architectural glass live under very different rulebooks. Here&#039;s where the two worlds converge, where they diverge, and what a building inspection actually demands.</description>
    <author>TemGlass</author>
    <category>Certifications &amp; Compliance</category>
    <pubDate>Mon, 02 Nov 2026 16:03:32 GMT</pubDate>
  </item>
  <item>
    <title>Crate, Weight, and Distance: Decoding the Real Freight Cost of Your Tempered Glass Order</title>
    <link>https://www.temglass.com/tempered-glass-freight-costs-plant-to-jobsite/</link>
    <guid isPermaLink="true">https://www.temglass.com/tempered-glass-freight-costs-plant-to-jobsite/</guid>
    <description>Tempered glass is among the costliest building materials to move, and the freight line on your quote often hides more than it reveals. We break down crating, carrier surcharges, and delivery constraints — then walk through a real order where logistics added nearly half the product cost.</description>
    <author>TemGlass</author>
    <category>Market Analysis</category>
    <pubDate>Mon, 02 Nov 2026 12:03:42 GMT</pubDate>
  </item>
  <item>
    <title>Walking on Air, Responsibly: The Real Load Math Behind Glass Walkovers and Tread Covers</title>
    <link>https://www.temglass.com/glass-walkovers-load-math-tread-covers/</link>
    <guid isPermaLink="true">https://www.temglass.com/glass-walkovers-load-math-tread-covers/</guid>
    <description>Glass flooring has moved from novelty to mainstream in US residential and commercial design, but the specifications behind it are often borrowed from the wrong application. This piece breaks down the load calculations, deflection limits, and layer builds that separate a safe walkable assembly from an expensive liability.</description>
    <author>TemGlass</author>
    <category>Market Analysis</category>
    <pubDate>Mon, 02 Nov 2026 08:02:53 GMT</pubDate>
  </item>
  <item>
    <title>Downsizing Without Downgrading: A Specifier&#039;s Framework for Substituting 6mm Tempered Glass in Framed Systems</title>
    <link>https://www.temglass.com/downsizing-6mm-tempered-glass-substitution-framework/</link>
    <guid isPermaLink="true">https://www.temglass.com/downsizing-6mm-tempered-glass-substitution-framework/</guid>
    <description>Improved tempering consistency and modern load modeling have made 6mm tempered glass a credible substitute for 10mm in many framed commercial applications. Here&#039;s a practical decision framework for when the substitution saves real money — and when it invites callbacks.</description>
    <author>TemGlass</author>
    <category>Market Analysis</category>
    <pubDate>Mon, 02 Nov 2026 00:02:30 GMT</pubDate>
  </item>
  <item>
    <title>Schedule Is the New Price: Why Response Time Decides Tempered Glass Contracts</title>
    <link>https://www.temglass.com/schedule-is-the-new-price-response-time-tempered-glass-contracts/</link>
    <guid isPermaLink="true">https://www.temglass.com/schedule-is-the-new-price-response-time-tempered-glass-contracts/</guid>
    <description>Across the US construction market, tempered glass buyers are increasingly trading a modest premium for guaranteed delivery dates. We break down where lead time is actually spent, how seasonal backlogs shift the calendar, and what to ask a fabricator before your schedule-critical order is committed.</description>
    <author>TemGlass</author>
    <category>Market Analysis</category>
    <pubDate>Sun, 01 Nov 2026 20:02:39 GMT</pubDate>
  </item>
  <item>
    <title>Quiet by Design: What STC Ratings Really Tell You Before You Order Tempered Glass</title>
    <link>https://www.temglass.com/quiet-by-design-stc-ratings-tempered-glass/</link>
    <guid isPermaLink="true">https://www.temglass.com/quiet-by-design-stc-ratings-tempered-glass/</guid>
    <description>Acoustic performance has moved from a nice-to-have to a line item on architectural specs across offices, schools, and multifamily housing. Here&#039;s how thickness, edge work, and lamination choices determine whether a tempered panel actually delivers the sound control your project is paying for.</description>
    <author>TemGlass</author>
    <category>Market Analysis</category>
    <pubDate>Sun, 01 Nov 2026 12:03:28 GMT</pubDate>
  </item>
  <item>
    <title>Certified Safe, Not Invincible: Closing the Expectation Gap Between Tempered Glass and the People Who Lean On It</title>
    <link>https://www.temglass.com/certified-safe-not-invincible-tempered-glass-expectations/</link>
    <guid isPermaLink="true">https://www.temglass.com/certified-safe-not-invincible-tempered-glass-expectations/</guid>
    <description>Tempered glass earns its safety certification through strength and break patterns — not through immunity to failure. This piece examines where buyer assumptions diverge from tested performance, and how suppliers can set expectations before the sale to prevent disputes down the line.</description>
    <author>TemGlass</author>
    <category>Certifications &amp; Compliance</category>
    <pubDate>Sun, 01 Nov 2026 00:04:46 GMT</pubDate>
  </item>
  <item>
    <title>Heat Doesn&#039;t Break Glass Evenly: Rethinking Tempered Panels Near Cooking and Warming Equipment</title>
    <link>https://www.temglass.com/tempered-glass-thermal-shock-near-heat-equipment/</link>
    <guid isPermaLink="true">https://www.temglass.com/tempered-glass-thermal-shock-near-heat-equipment/</guid>
    <description>A safety rating certifies how glass breaks, not how it handles heat. This article examines thermal shock mechanics behind tempered panel failures near commercial heat lamps, salamanders, and fireplaces, and offers practical spec guidance for high-temperature zones.</description>
    <author>TemGlass</author>
    <category>Certifications &amp; Compliance</category>
    <pubDate>Sat, 31 Oct 2026 20:04:22 GMT</pubDate>
  </item>
  <item>
    <title>When Nothing Hit It: The Liability Vacuum Behind Spontaneous Glass Failures</title>
    <link>https://www.temglass.com/spontaneous-glass-breakage-liability-vacuum/</link>
    <guid isPermaLink="true">https://www.temglass.com/spontaneous-glass-breakage-liability-vacuum/</guid>
    <description>A tempered panel shatters with no impact, and suddenly nobody is sure whose problem it is. We argue the industry&#039;s refusal to standardize failure documentation leaves fabricators, glaziers, and owners all worse off—and proposes a fix.</description>
    <author>TemGlass</author>
    <category>Certifications &amp; Compliance</category>
    <pubDate>Sat, 31 Oct 2026 12:05:48 GMT</pubDate>
  </item>
  <item>
    <title>Cut Table to Curb: Where Your Tempered Glass Order Actually Spends Its Time</title>
    <link>https://www.temglass.com/cut-table-to-curb-glass-order-pipeline/</link>
    <guid isPermaLink="true">https://www.temglass.com/cut-table-to-curb-glass-order-pipeline/</guid>
    <description>Most delays and breakage claims don&#039;t originate where buyers think they do. We follow a single commercial order through cutting, edging, tempering, and freight to show exactly where schedules slip and panels get damaged.</description>
    <author>TemGlass</author>
    <category>Market Analysis</category>
    <pubDate>Sat, 31 Oct 2026 12:05:48 GMT</pubDate>
  </item>
  <item>
    <title>The Distortion We&#039;ve Learned to Accept: Why Roller Wave Tolerance Needs a Rethink for Modern Retail Glazing</title>
    <link>https://www.temglass.com/roller-wave-distortion-retail-glazing-astm-c1048/</link>
    <guid isPermaLink="true">https://www.temglass.com/roller-wave-distortion-retail-glazing-astm-c1048/</guid>
    <description>ASTM C1048&#039;s roller wave limits were written for a different era of glass — one without floor-to-ceiling storefronts, low-iron lites, and heat-treated insulated units. Here&#039;s why the standard tolerance no longer matches market expectations, and how buyers can protect themselves before panels leave the truck.</description>
    <author>TemGlass</author>
    <category>Market Analysis</category>
    <pubDate>Sat, 31 Oct 2026 08:03:11 GMT</pubDate>
  </item>
  <item>
    <title>Specifying the Edge You Actually Need: A Buyer&#039;s Guide to Grind, Polish, and Bevel Before the Quote Goes Out</title>
    <link>https://www.temglass.com/specifying-tempered-glass-edge-work-grind-polish-bevel/</link>
    <guid isPermaLink="true">https://www.temglass.com/specifying-tempered-glass-edge-work-grind-polish-bevel/</guid>
    <description>Edge treatment is the most commonly omitted line item in tempered glass RFPs, and the omission costs buyers in change orders, rejected panels, and premature field failures. This guide explains when edge work is structural, when it&#039;s cosmetic, and how to write an edge specification that holds up.</description>
    <author>TemGlass</author>
    <category>Certifications &amp; Compliance</category>
    <pubDate>Sat, 31 Oct 2026 08:03:11 GMT</pubDate>
  </item>
  <item>
    <title>When Glass Breaks Itself: Nickel Sulfide Inclusions and the Case for Heat-Soak Testing</title>
    <link>https://www.temglass.com/nickel-sulfide-inclusions-heat-soak-testing/</link>
    <guid isPermaLink="true">https://www.temglass.com/nickel-sulfide-inclusions-heat-soak-testing/</guid>
    <description>Spontaneous breakage in tempered glass isn&#039;t a myth — it&#039;s a metallurgical defect with a documented failure mechanism. This article explains how nickel sulfide inclusions form, what heat-soak testing actually guarantees, and the contract language that protects facility managers when a panel lets go without warning.</description>
    <author>TemGlass</author>
    <category>Certifications &amp; Compliance</category>
    <pubDate>Sat, 31 Oct 2026 04:03:41 GMT</pubDate>
  </item>
  <item>
    <title>Stop Over-Tempering: Why Heat-Strengthened Glass Deserves a Second Look on Your Next Quote</title>
    <link>https://www.temglass.com/tempered-vs-heat-strengthened-spec-decision/</link>
    <guid isPermaLink="true">https://www.temglass.com/tempered-vs-heat-strengthened-spec-decision/</guid>
    <description>Full tempering has become the default answer on American glazing specs, and it&#039;s costing projects money and optical clarity they don&#039;t need to sacrifice. Here&#039;s where heat-strengthened glass outperforms, where tempered remains non-negotiable, and a checklist for evaluating supplier quotes.</description>
    <author>TemGlass</author>
    <category>Market Analysis</category>
    <pubDate>Sat, 31 Oct 2026 04:03:41 GMT</pubDate>
  </item>
  <item>
    <title>The Inspector&#039;s List: Seven Overlooked Locations Where the Code Demands Safety Glazing</title>
    <link>https://www.temglass.com/inspectors-list-overlooked-safety-glazing-locations/</link>
    <guid isPermaLink="true">https://www.temglass.com/inspectors-list-overlooked-safety-glazing-locations/</guid>
    <description>Safety glazing violations are among the most common — and most preventable — reasons residential and light commercial projects fail final inspection. We break down seven frequently missed locations under the IBC and IRC, why the rules exist, and what field inspectors check first.</description>
    <author>TemGlass</author>
    <category>Market Analysis</category>
    <pubDate>Sat, 31 Oct 2026 00:03:40 GMT</pubDate>
  </item>
  <item>
    <title>Coastal Glazing That Survives the Spec Review: Wind-Borne Debris Codes, Miami-Dade Approvals, and the Tempered vs. Laminated Decision</title>
    <link>https://www.temglass.com/coastal-glazing-wind-borne-debris-codes-miami-dade-approvals/</link>
    <guid isPermaLink="true">https://www.temglass.com/coastal-glazing-wind-borne-debris-codes-miami-dade-approvals/</guid>
    <description>Along the Gulf and Atlantic coasts, glazing specifications face scrutiny that inland projects never encounter. This guide walks through ASTM E1996, Miami-Dade and Florida product approvals, and the practical trade-offs between tempered and laminated assemblies for commercial coastal builds.</description>
    <author>TemGlass</author>
    <category>Certifications &amp; Compliance</category>
    <pubDate>Sat, 31 Oct 2026 00:03:40 GMT</pubDate>
  </item>
  <item>
    <title>The New Economics of Tempered Glass: What Tariffs and Reshoring Mean for Your 2026 Budget</title>
    <link>https://www.temglass.com/tariffs-reshoring-tempered-glass-pricing-2025/</link>
    <guid isPermaLink="true">https://www.temglass.com/tariffs-reshoring-tempered-glass-pricing-2025/</guid>
    <description>Import duties, elevated energy costs, and a wave of domestic capacity investment are rewriting the pricing playbook for tempered glass. Here&#039;s what U.S. buyers should expect in 2026 — and five procurement strategies to stabilize supply and cost.</description>
    <author>TemGlass</author>
    <category>Market Analysis</category>
    <pubDate>Fri, 30 Oct 2026 20:04:09 GMT</pubDate>
  </item>
  <item>
    <title>Safety Glazing Decoded: A Spec Writer&#039;s Field Guide to ANSI Z97.1 and CPSC 16 CFR 1201</title>
    <link>https://www.temglass.com/safety-glazing-ansi-z97-1-vs-cpsc-16-cfr-1201-guide/</link>
    <guid isPermaLink="true">https://www.temglass.com/safety-glazing-ansi-z97-1-vs-cpsc-16-cfr-1201-guide/</guid>
    <description>Choosing between ANSI Z97.1 and CPSC 16 CFR 1201 is one of the most common sources of failed permit reviews in U.S. construction. This guide breaks down when each standard applies, includes a practical decision checklist, and explains how to verify supplier certification documentation before you order.</description>
    <author>TemGlass</author>
    <category>Certifications &amp; Compliance</category>
    <pubDate>Fri, 30 Oct 2026 20:04:09 GMT</pubDate>
  </item>
</channel>
</rss>